NextGen CPT 1p0 Guatemala CMC1-CanCM3 Forecast PredErrorVars: prediction error variance data
PredErrorVars prediction error variance from NextGen CPT 1p0 Guatemala CMC1-CanCM3 Forecast: Forecast and Error.
Independent Variables (Grids)
- Forecast Lead Time in Months
- grid: /L (months) ordered [ (2.5)] :grid
- Hecho en (forecast_reference_time)
- grid: /S (months since 1960-01-01) ordered (0000 1 Jan 2019) to (0000 1 Jul 2019) by 1.0 N= 7 pts :grid
- Longitud (longitude)
- grid: /X (degree_east) ordered (94W) to (87W) by 1.0 N= 8 pts :grid
- Latitude (latitude)
- grid: /Y (degree_north) ordered (12.5N) to (18.5N) by 1.0 N= 7 pts :grid
Other Info
- bufferwordsize
- 4
- CE
- null
- colorscalename
- rainbowcolorscale
- CS
- 0
- datatype
- realarraytype
- file_missing_value
- -999.0
- maxncolor
- 256
- missing_value
- NaN
- pointwidth
- 0
- units
- mm2 /day2
- standard units*
- 1.33959190672154×10-16 meter2 second-2
Last updated: Fri, 10 Apr 2020 20:38:02 GMT
Expires: Sat, 09 May 2020 00:00:00 GMT